SSP : engineering geology; choice of a construction site for individual house-building...
Engineering geology: choice of a construction site for house-building and many other things...
About us Services Equipment Scientific part Examples Connection Map Forum Links ? Ru

List of examples:
Example 1
Example 2
Example 3
Example 4
Example 5
Example 6
Example 7
Example 8
Example 9
Example 10
Example 11
Example 12
Example 13
Example 14
Example 15
Example 16
Example 17
Example 18
Example 19
Example 20
Example 21
Example 22
Example 23
Example 24
Example 25
Example 26
Example 27
Example 28

Choice of a construction site for individual house-building

     It is necessary under cottage there was no tectonic zone. For this purpose the construction site is researched by SSP method. All site is investigated by a grid of profiles, and on form of received SSP-sections come to light:
а) zones with the lowered bearing capacity of a soil are caused by tectonic failures;
б) floating earth (karsts), if they are.

    On the basis of the received information on the plan of a surveyed site may be marked:

  1. zone unsuitable for construction. It is a zone with the lowered bearing capacity of a soil. Result of construction within of these zones is the increased deformations of a foundation under a cottage. Not less important is that these zones are simultaneously and geopathogenic zones, the long presence in which is harmful to the man.
  2. zone suitable for construction. It is a zone with normal (standard) bearing capacity of a soil.

Investigation of site building diagram
Investigation of site building diagram; engineering geology

     An example is figure with the plan of the surveyed private site of building near station "Oselki" (Leningrad area). On the plan are all SSP-profiles, points of their binding, and also the zone, suitable for construction (is designated by a green dotted line) and the zones unsuitable for construction (are designated by a red dotted line). In the given concrete case the area of a zone, suitable for construction, has appeared quite sufficient for accommodation of an apartment house, bath-house and summer kitchen. The second stage at inspection of a site was a prospecting of place under well-boring for water (more in detail about prospecting for water in Examples 22, 23).



When use material of a this websaite reference to www.newgeophys.spb.ru obligatory
To start | About us | Services | Equipment | Scientific part | Examples | Connection | Map | Forum | Links | About project | Ru

Поддержка и продвижение сайта "Геофизпрогноз"

Реклама на сайте: